PRIOR HOUSE UPGRADES

>Here’s a summary of work we’ve done over the last few years. Click the years for more details.

SUMMER 2014 ~ $5,000


Walkway and breezeway rebuild

  • removed old cement stairs
  • poured new stairs

SUMMER 2015 ~ $16,500


Upstairs shared bathroom

  • new tile (floor, walls, shower)
  • refreshed medicine cabinet
  • new ceiling
  • fresh paint on walls

Upstairs large bedroom and hallway

  • new ceiling
  • fresh paint on walls

Upstairs back & front bedroom closets

  • replaced old wood with sheetrock
  • fresh paint on walls

SUMMER 2016 ~ $3,495.72


Upstairs front bedroom $2,918.18

  • new ceiling
  • removed old wallpaper
  • fresh paint on walls

Basement TV & prayer rooms (work bee) $577.54

  • fix ceiling
  • paint walls
  • paint floors


 
>Here are some pictures from work done during the summer of 2016.

This slideshow requires JavaScript.